
Detaylar
The flooring of the mechanical shaft were equipped with insulation to prevent the spread of fire transitions.
Başlangıç Tarihi
June 24, 2008
Bölge
Batumi-Georgia
Kategori
YapıBitiş Tarihi
September 8, 2008
The flooring of the mechanical shaft were equipped with insulation to prevent the spread of fire transitions.
June 24, 2008
Batumi-Georgia
September 8, 2008